Show on map
Waynesboro Virginia Plant — Power plant · Coal · The LYCRA Company - Waynesboro VA PlantElm Spring Solar 1 — Announced · Solar · VA · 3 MW · 4.5 mi awayWaynesboro - VA 0426 (Patterson B) — Under construction · Solar · VA · 5 MW · 6.2 mi awayShenvalee Solar — Announced · Solar · VA · 3 MW · 8.1 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Waynesboro Virginia Plant

Power plant · Coal

Key facts

Power plant · Coal Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1929
Net generation, 2010
0 MWh
Location
Augusta County, Virginia
Operated by
The LYCRA Company - Waynesboro VA PlantSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2010
Fuel burned MMBtu by year, 2001 to 2010
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
97 years since 1929
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2010
First unit retired
January 2008
Capacity retired
12.4 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN3Conventional Steam Coal3 MWRetiredJanuary 2008
GEN1Conventional Steam Coal3 MWRetiredDecember 2010
GEN2Conventional Steam Coal3 MWRetiredDecember 2010
GEN4Conventional Steam Coal3.4 MWRetiredDecember 2010

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN1, GEN2, GEN4 scheduled to retire, 9.4 MW · EIA-860M
  • Stated Unit GEN3 scheduled to retire, 3 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elm Spring Solar 1 Announced Solar 4.5 mi 3
Waynesboro - VA 0426 (Patterson B) Under construction Solar 6.2 mi 5
Shenvalee Solar Announced Solar 8.1 mi 3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution