Weiser BESS — Power plant · Storage · Idaho Power CoFry Ontario Solar Project — Solar · OR · 4.2 MW · 17.7 km away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Weiser BESS

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
-248 MWh
Grid
12 kV to Idaho Power Co (IPCO)
Location
Washington County, Idaho
Operated by
Idaho Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Idaho Power Co
Balancing authority code
IPCO
Balancing authority name
Idaho Power Company
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-248
Balancing authority codeIPCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -248.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Fry Ontario Solar Project Under construction Solar 17.7 km 4.2

Sources Berkeley Lab · EIA-860M

Sources

  • LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Open license, with credit · retrieved 4 Nov 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.