Wellesley College Central Utility Plant

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 8% of 2025 Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1985
Net generation, 2025
9,620 MWh
Grid
15 kV to Town of Wellesley - (MA) (ISNE)
Location
Norfolk County, Massachusetts
Operated by
Wellesley CollegeSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
41 years since 1985
Heat rate
8,465 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
15
Transmission owner
Town of Wellesley - (MA)
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Eia status
By code
OP
Mw
3.80
Units
2
OS
Mw
7.10
Units
5
SB
Mw
3
Units
1
Standby mw
3
Status rule
majority_mw_out_of_service
In service mw
13.90
Out of service mw
7.10
Fuel burned (MMBtu), 202581,429
Capacity factor, 20250.079
Heat rate (Btu/kWh), 20258,464.8
Net generation (MWh), 20259,619.7
Balancing authority codeISNE

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Framingham BESS Under construction Storage 4.4 mi 5
WESTBOROUGH DATA CENTER Built Large load 14.0 mi