Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
West Mesa - Four Corners 345 kV: route and 14 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
West Mesa - Four Corners 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-NM
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 156
- Substations at the ends (as the source names them)
- West Mesa to Four Corners
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 307661 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| NTEC Gas Plant Filed | Gas, combustion turbine | 0.2 mi | 1,089 |
| Oso Negro Permitted | Storage | 0.3 mi | 100 |
| WESTPOINTE DATA CENTER Built | Large load | 2.1 mi | |
| CNM WESTSIDE DATA CENTER Filed | Large load | 3.7 mi | |
| OSO GRANDE TECHNOLOGY Filed | Large load | 4.2 mi | |
| ALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER Built | Large load | 5.5 mi | |
| Clean Path Energy Center Postponed | Gas, combined cycle | 6.1 mi | 735 |
| PRESBYTERIAN HEALTHCARE INFO SYS CTR Built | Large load | 6.9 mi | |
| Rockmont Solar and Storage Project Filed | Solar + storage | 7.4 mi | 130 |
| CSC-A Built | Large load | 7.4 mi | |
| Corazon Energy Storage Under construction | Storage | 7.7 mi | 150 |
| Pinon Energy Center Postponed | Gas, combustion turbine | 7.8 mi | 292.6 |
| Westside - (NM) Under construction | Gas, reciprocating engine | 8.4 mi | 60 |
| SLO-2 Under construction | Solar | 12.7 mi | 5 |
Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air · Berkeley Lab
Sources
- EIA-860M
- EPA ICIS-NPDES
- EPA ICIS-Air
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.