Weston — Power plant · Coal · Wisconsin Public Service Corp
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 58% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1981
Net generation, 2025
4,842,420 MWh
Grid
345 kV, 115 kV to American Transmission Co (MISO)
Location
Marathon County, Wisconsin

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
45 years since 1981
Unused energy
3,440 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,841 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110043779783
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000986
Fuel burned (MMBtu), 202547,655,789
Capacity factor, 20250.585
Heat rate (Btu/kWh), 20259,841.3
Net generation (MWh), 20254,842,420.0
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
217.9 MW
Generators retired
4
Capacity still in service
945.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal60 MWRetiredJune 2015
2Natural Gas Steam Turbine81.6 MWRetiredJanuary 2023
31Natural Gas Fired Combustion Turbine19.6 MWRetiredJune 2023
32Natural Gas Fired Combustion Turbine56.7 MWRetiredJune 2023
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine81.6 MW
Natural Gas Fired Combustion Turbine76.3 MW
Conventional Steam Coal60 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV, 115 kV
Transmission or distribution system owner
American Transmission Co
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
Transmission lines within 15 mi (8)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies5
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Wisconsin Public Service Corp Operator EIA-860M
WEC Energy Group Owner 76.0% Dec 31, 2023 EPA GHGRP
Dairyland Power Coop Owner 24.0% Dec 31, 2023 EPA GHGRP
Dairyland Power Coop Owner 18.9% Dec 31, 2025 EIA-860
Wisconsin Public Service Corp Owner 44.1% Dec 31, 2025 EIA-860

Timeline

  • Stated Units 31, 32 scheduled to retire, 76.3 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 81.6 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 60 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution