Westwind Trust — Power plant · Wind · New Dimension Energy Company, LLCWestwind Trust unit WTGS — Postponed · Wind · CA · 15.6 MW · 0.0 km awayPainted Hills — Postponed · Wind · CA · 17.5 MW · 8.4 km awayPainted Hills IV Wind — Withdrawn · Wind · CA · 19.5 MW · 8.9 km awaySolar Photovoltaic Project #45 — Postponed · Solar · CA · 6 MW · 11.3 km awayAlta Mesa Project Phase IV — Postponed · Wind · CA · 40 MW · 12.1 km away
  • Wind & solar
  • Retired
  • 10 · 100 · 1,000 MW

Westwind Trust

Power plant · Wind

Key facts

Power plant · Windran 7% of 2015 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2015
9,657 MWh
Location
Riverside County, California
Operated by
New Dimension Energy Company, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2015

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
40 years since 1986
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2017
Capacity retired
16 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
WIN1Onshore Wind Turbine16 MWRetiredDecember 2017

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 25 km (10)
Connection points within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit WIN1 scheduled to retire, 16 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Westwind Trust unit WTGS Postponed Wind 0.0 km 15.6
Painted Hills Postponed Wind 8.4 km 17.5
Painted Hills IV Wind Withdrawn Wind 8.9 km 19.5
Solar Photovoltaic Project #45 Postponed Solar 11.3 km 6
Alta Mesa Project Phase IV Postponed Wind 12.1 km 40

Sources EIA-860M · CAISO