Show on map
Whippany 230 kV line — Transmission lineEASTGREEN INC AIG DATA CENTER — Built · Large load · NJ · 3.3 mi awayDLR Totowa Building A (Totowa data centre) — Filed · Large load · NJ · 9.0 mi awayCoreweave — Under construction · Large load · NJ · 11.3 mi awayBPL NJ - Union Distribution Center — Under construction · Solar · NJ · 1.5 MW · 11.8 mi awayCLIFTON DATA CENTER — Built · Large load · NJ · 12.6 mi awayAB Newark Solar — Postponed · Solar · NJ · 5.6 MW · 12.8 mi awayElizabeth Metropolitan Logistics Center — Under construction · Solar · NJ · 1.2 MW · 13.0 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 13.0 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 13.7 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 13.8 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Whippany 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NJ
Owner (as stated)
Jersey Central Power Light

Details

Who’s behind it

Owner
Jersey Central Power Light

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Whippany
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itjersey central power light
HIFLD line ID118385
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EASTGREEN INC AIG DATA CENTER Built Large load 3.3 mi
DLR Totowa Building A (Totowa data centre) Filed Large load 9.0 mi
Coreweave Under construction Large load 11.3 mi
BPL NJ - Union Distribution Center Under construction Solar 11.8 mi 1.5
CLIFTON DATA CENTER Built Large load 12.6 mi
AB Newark Solar Postponed Solar 12.8 mi 5.6
Elizabeth Metropolitan Logistics Center Under construction Solar 13.0 mi 1.2
BARCLAYS CAPITAL DATA CENTER Built Large load 13.0 mi
RAR DEVELOPMENT ASSOCIATES × 2 units Built Large load 13.7 mi

Sources EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES · EIA-860M

Sources

Attribution