Show on map
White Baker - Oxy Century 161 kV — Transmission lineRE Maplewood — Postponed · Solar · TX · 300 MW · 11.6 mi awayGreenalia Solar Power Blackwelder Ranch — Announced · Solar · TX · 199.7 MW · 14.9 mi awayBlackwelder Ranch Wind — Announced · Wind · TX · 110.4 MW · 14.9 mi away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

White Baker - Oxy Century 161 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
161 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
22
Substations at the ends (as the source names them)
White Baker to Oxy Century
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID313611
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
RE Maplewood Postponed Solar 11.6 mi 300
Greenalia Solar Power Blackwelder Ranch Announced Solar 14.9 mi 199.7
Blackwelder Ranch Wind Announced Wind 14.9 mi 110.4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution