Show on map
White Baker - Rio Pecos 138 kV — Transmission lineMorada del Sol, LLC — Postponed · Solar · TX · 247 MW · 7.1 mi awayRE Maplewood — Postponed · Solar · TX · 300 MW · 7.5 mi awayMendoza Trail BESS — Under construction · Storage · TX · 200 MW · 8.0 mi awayCrane 2 BESS 2 — Postponed · Storage · TX · 150 MW · 10.8 mi awayUpton BESS 2 — Postponed · Storage · TX · 150 MW · 11.9 mi awayGreenalia Solar Power Blackwelder Ranch — Announced · Solar · TX · 199.7 MW · 14.9 mi awayBlackwelder Ranch Wind — Announced · Wind · TX · 110.4 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

White Baker - Rio Pecos 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Rio Grande Electric Coop

Details

Who’s behind it

Owner
Rio Grande Electric Coop

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
15
Substations at the ends (as the source names them)
White Baker to Rio Pecos
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itrio grande electric coop
HIFLD line ID302988
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Morada del Sol, LLC Postponed Solar 7.1 mi 247
RE Maplewood Postponed Solar 7.5 mi 300
Mendoza Trail BESS Under construction Storage 8.0 mi 200
Crane 2 BESS 2 Postponed Storage 10.8 mi 150
Upton BESS 2 Postponed Storage 11.9 mi 150
Greenalia Solar Power Blackwelder Ranch Announced Solar 14.9 mi 199.7
Blackwelder Ranch Wind Announced Wind 14.9 mi 110.4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution