Show on map
Whiteville 230 kV line — Transmission lineMidfield Solar, LLC — Under construction · Solar · NC · 25 MW · 3.1 mi awayWhiteville Solar 2 — Postponed · Solar · NC · 5 MW · 4.6 mi awayEastway Solar, LLC — Postponed · Solar · NC · 4.9 MW · 10.9 mi awayRobeson Solar I — Announced · Solar + storage · NC · 108 MW · 11.4 mi awayInnovative Solar 72 — Postponed · Solar · NC · 33.5 MW · 14.2 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Whiteville 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Duke Energy Progress

Details

Who’s behind it

Owner
Duke Energy Progress

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
16
Substations at the ends (as the source names them)
Whiteville
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy progress
HIFLD line ID157048
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Midfield Solar, LLC Under construction Solar 3.1 mi 25
Whiteville Solar 2 Postponed Solar 4.6 mi 5
Eastway Solar, LLC Postponed Solar 10.9 mi 4.9
Robeson Solar I Announced Solar + storage 11.4 mi 108
Innovative Solar 72 Postponed Solar 14.2 mi 33.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution