- Clean firm
- Operating
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Operating
Whiting: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Whiting
Power plant · Hydro
Key facts
Power plant · Hydroran 36% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1891
- Net generation, 2025
- 16,079 MWh
- Grid
- 46 kV to Consolidated Water Power Co (MISO)
- Location
- Portage County, Wisconsin
- Operated by
- Consolidated Water Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 16,079
MWh - Fuel burned, 2025
- 54,861
MMBtu - Capacity factor, 2025
- 36.0
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 16,079 | 54,861 | 36.0% | — |
| 2024 | 24,997 | 85,291 | 55.8% | — |
| 2023 | 21,152 | 72,170 | 47.3% | — |
| 2022 | 24,810 | 84,653 | 55.5% | — |
| 2021 | 24,848 | 219,757 | 55.6% | — |
| 2020 | 28,500 | 249,860 | 63.6% | — |
| 2019 | 30,243 | 269,310 | 67.7% | — |
| 2018 | 30,474 | 277,438 | 68.2% | — |
| 2017 | 30,985 | 285,463 | 69.3% | — |
| 2016 | 31,818 | 293,744 | 71.0% | — |
| 2015 | 27,413 | 255,462 | 61.4% | — |
| 2014 | 27,195 | 258,626 | 60.9% | — |
| 2013 | 22,251 | 212,297 | 49.8% | — |
| 2012 | 20,513 | 195,201 | 45.8% | — |
| 2011 | 19,029 | 184,885 | 42.6% | — |
| 2010 | 18,082 | 176,408 | 40.5% | — |
| 2009 | 21,131 | 206,238 | 47.3% | — |
| 2008 | 22,884 | 225,499 | 51.1% | — |
| 2007 | 18,927 | 187,075 | 42.4% | — |
| 2006 | 19,771 | 196,109 | 44.2% | — |
| 2005 | 19,184 | 191,821 | 42.9% | — |
| 2004 | 20,496 | 205,411 | 45.8% | — |
| 2003 | 17,486 | 179,074 | 39.1% | — |
| 2002 | 18,634 | 189,564 | 41.7% | — |
| 2001 | 18,735 | 193,589 | 41.9% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.