Show on map
Whitpain 230 kV line — Transmission lineWest Point (PA) — Under construction · Gas, reciprocating engine · PA · 2.5 MW · 1.7 mi awayINNOVATION 2201 LLC / UPPER MERION TWP — Built · Large load · PA · 6.2 mi awayVALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE — Built · Large load · PA · 6.7 mi awayCSL BEHRING DATA CTR/KING OF PRUSSIA — Built · Large load · PA · 7.4 mi awayFLEXENTIAL/ UPPER PROVIDENCE TWP — Built · Large load · PA · 9.1 mi away365 DATA CENTERS — Built · Large load · PA · 11.7 mi awayH5 DATA CENTERS — Built · Large load · PA · 11.7 mi awayCROSS CONNECT SOLUTIONS — Built · Large load · PA · 11.9 mi awayEQUINIX — Large load · PA · 11.9 mi away
  • Combustion
  • Loads
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Whitpain 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-PA
Owner (as stated)
PECO Energy

Details

Who’s behind it

Owner
PECO Energy

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
10
Substations at the ends (as the source names them)
Whitpain
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpeco energy
HIFLD line ID104420
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
West Point (PA) Under construction Gas, reciprocating engine 1.7 mi 2.5
INNOVATION 2201 LLC / UPPER MERION TWP Built Large load 6.2 mi
VALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE Built Large load 6.7 mi
CSL BEHRING DATA CTR/KING OF PRUSSIA Built Large load 7.4 mi
FLEXENTIAL/ UPPER PROVIDENCE TWP Built Large load 9.1 mi
365 DATA CENTERS Built Large load 11.7 mi
H5 DATA CENTERS Built Large load 11.7 mi
CROSS CONNECT SOLUTIONS Built Large load 11.9 mi
EQUINIX Unknown Large load 11.9 mi

Sources EIA-860M · EPA ICIS-Air