Whittier LFG Power Plant #1
Power plant · Biomass
Key facts
Power plant · Biomassran 53% of 2017 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2006
- Net generation, 2017
- 10,142 MWh
- Grid
- 12 kV to Southern California Edison Co (CISO)
- Location
- Los Angeles County, California
- Operated by
- J&A-Whittier LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2017
- 10,142
MWh - Fuel burned, 2017
- 65,003
MMBtu - Capacity factor, 2017
- 52.6
% - Heat rate, 2017
- 6,409
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2017 | 10,142 | 65,003 | 52.6% | 6,409 |
| 2016 | 9,911 | 64,790 | 51.3% | 6,537 |
| 2015 | 9,561 | 59,891 | 49.6% | 6,264 |
| 2013 | 9,722 | 86,501 | 50.4% | 8,897 |
| 2012 | 8,664 | 84,793 | 44.8% | 9,787 |
| 2011 | 8,804 | 6,568 | 45.7% | — |
| 2010 | 11,778 | 76,935 | 61.1% | 6,532 |
| 2009 | 8,387 | 70,396 | 43.5% | 8,394 |
| 2008 | 8 | 61 | 0.0% | 7,625 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.