Whittier LFG Power Plant #1 — Power plant · Biomass · J&A-Whittier LLCCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 3.4 mi awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 5.0 mi awayMarici — Under construction · Storage · CA · 400 MW · 6.3 mi awayGabriel — Under construction · Storage · CA · 400 MW · 10.6 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 10.7 mi awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 12.2 mi awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 12.4 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 13.4 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 13.4 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 13.4 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 13.5 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 13.8 mi awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 13.9 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Whittier LFG Power Plant #1

Power plant · Biomass

Key facts

Power plant · Biomassran 53% of 2017 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2006
Net generation, 2017
10,142 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California
Operated by
J&A-Whittier LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2008 to 2017
Fuel burned MMBtu by year, 2008 to 2017
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
20 years since 2006
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Balancing authority codeCISO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CPA 3777 Workman Postponed Solar 3.4 mi 1.9
Bandini - SLLAX710 Under construction Solar 5.0 mi 1.3
Marici Under construction Storage 6.3 mi 400
Gabriel Under construction Storage 10.6 mi 400
PRIME DATA CENTER VERNON Built Large load 10.7 mi
Glenarm BESS Plant Filed Storage 12.2 mi 25
California Institute of Technology Postponed Gas, combined cycle 12.4 mi 16.5
LATTC South Campus Solar Postponed Solar 13.4 mi 1.1
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 13.4 mi 1.3
Fordyce - SLLAX680 Under construction Solar 13.4 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 13.5 mi 1.2
Dominguez - SLLAX512 Under construction Solar 13.8 mi 1.3
Westminster Reliability Project, LLC Under construction Storage 13.9 mi 110

Sources EIA-860M · CAISO · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 20, 2026Source: California ISO
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution