Show on map
Wilbur East Power Plant — Power plant · Oil · GWF Power Systems. L.P.Oakley Generating Station — Withdrawn · Gas, combined cycle · CA · 672.3 MW · 0.5 mi awayPittsburg RV Solar — Under construction · Solar · CA · 2.8 MW · 4.9 mi awaySolano Wind — Postponed · Wind · CA · 95.5 MW · 7.3 mi away
  • Combustion
  • Wind & solar
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Wilbur East Power Plant

Power plant · Oil

Key facts

Power plant · Oilran 10% of 2012 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1989
Net generation, 2012
17,256 MWh
Location
Contra Costa County, California
Operated by
GWF Power Systems. L.P.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2012
Fuel burned MMBtu by year, 2002 to 2012
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Coke”
Age
37 years since 1989

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2012
Capacity retired
20.5 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Petroleum Coke20.5 MWRetiredMarch 2012

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN1 scheduled to retire, 20.5 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Oakley Generating Station Withdrawn Gas, combined cycle 0.5 mi 672.3
Pittsburg RV Solar Under construction Solar 4.9 mi 2.8
Solano Wind Postponed Wind 7.3 mi 95.5

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO

Attribution