Wilkinson DeFore (Safari Energy)
Power plant · Solar
Key facts
Power plant · Solarran 25% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 6,574 MWh
- Grid
- 0.6 kV to Georgia Power Co (SOCO)
- Location
- Wilkinson County, Georgia
- Operated by
- Safari Energy, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 6,574
MWh - Fuel burned, 2025
- 22,430
MMBtu - Capacity factor, 2025
- 25.0
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 6,574 | 22,430 | 25.0% | — |
| 2024 | 6,187 | 21,109 | 23.5% | — |
| 2023 | 5,581 | 19,041 | 21.2% | — |
| 2022 | 6,245 | 21,307 | 23.8% | — |
| 2021 | 6,136 | 54,266 | 23.4% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.