Show on map
Wilton — Power plant · Oil · City of Wilton - (IA)West Liberty Wind Farm — Postponed · Wind · IA · 5 MW · 12.7 mi awayMuscatine Plant #1 — Permitted · Gas, combustion turbine · IA · 35 MW · 13.7 mi awayTipton — Postponed · Oil · IA · 1.2 MW · 14.0 mi awayMPW Solar 1 — Permitted · Solar · IA · 24 MW · 14.6 mi away
  • Combustion
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1992
Net generation, 2025
8 MWh
Grid
69 kV to Central Iowa Power Cooperative (MISO)
Location
Muscatine County, Iowa
Operated by
City of Wilton - (IA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
34 years since 1992
Unused energy
81 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
13,500 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
69
Transmission owner
Central Iowa Power Cooperative
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 2025108
Capacity factor, 20250.000
Heat rate (Btu/kWh), 202513,500
Net generation (MWh), 20258
Balancing authority codeMISO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
West Liberty Wind Farm Postponed Wind 12.7 mi 5
Muscatine Plant #1 Permitted Gas, combustion turbine 13.7 mi 35
Tipton Postponed Oil 14.0 mi 1.2
MPW Solar 1 Permitted Solar 14.6 mi 24

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution