- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Windom: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Windom
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2001
- Net generation, 2025
- 32 MWh
- Grid
- 14 kV to City of Windom (MISO)
- Location
- Cottonwood County, Minnesota
- Operated by
- City of Windom (MN)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 25 years since 2001
- Heat rate
- 10,625 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 340 |
| Capacity factor, 2025 | 0.000 |
| Heat rate (Btu/kWh), 2025 | 10,625 |
| Net generation (MWh), 2025 | 32 |
| Balancing authority code | MISO |
Retirement
- Capacity retired
- 3 MW
- Generators retired
- 1
- Capacity still in service
- 11.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GT1 | Petroleum Liquids | 3 MW | Retired | April 2022 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- City of Windom
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
Transmission lines within 25 km (10)
- Lakefield Junction 161 kV line
- Lakefield Junction 345 kV line
- Lakefield Junction 161 kV line
- Lakefield Junction 161 kV line
- Lakefield Junction 345 kV line
- Lakefield Utilities 161 kV line
- Lakefield Junction 345 kV line
- Lakefield Junction - Obrien 345 kV
- Lakefield Junction 161 kV line
- Lakefield Junction 161 kV line
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit GT1 scheduled to retire, 3 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory