Show on map
Windsor Solar Project — Power plant · SolarEast Windsor cogeneration centre 2 — Under construction · Gas, combustion turbine · Canada · 100 MW · 7.3 km awayCity of Detroit Castle Solar — Under construction · Solar · MI · 10 MW · 16.2 km awayCity of Detroit Greenfield — Permitted · Solar · MI · 7 MW · 20.5 km away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Windsor Solar Project

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Commissioned
2016
Location
Ontario, Canada

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “utility-scale solar / PV”
Age
10 years since 2016
Units
1
1 attribute from Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Attributes
AttributeValue
Gem
Owners
Name
Connor Clark & Lunn Infrastructure
Name
Samsung Renewable Energy Inc
Unit ids
G100000805460
Location id
L100000804739
Subnational
Ontario
Unit statuses
Operating
1
Location accuracy
exact

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleSource
Connor Clark & Lunn Infrastructure Owner GEM
Samsung Renewable Energy Inc Owner GEM

Timeline

  • In service · GEM

Sources

2 sources

Sources GEM · Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
East Windsor cogeneration centre 2 Under construction Gas, combustion turbine 7.3 km 100
City of Detroit Castle Solar Under construction Solar 16.2 km 10
City of Detroit Greenfield Permitted Solar 20.5 km 7

Sources GEM · EIA-860M

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution