Show on map
Winmil Clean Energy Center (BESS) — Power plant · Storage · On Energy StorageMyrtle Solar, LLC — Under construction · Solar · TX · 313 MW · 0.2 mi awayWindmill Ridge Storage — Postponed · Storage · TX · 151.4 MW · 2.2 mi awayCradle Solar — Postponed · Solar · TX · 225 MW · 4.8 mi awayRock N' Roll — Studied · Solar + storage · TX · 358 MW · 5.1 mi awayBrazoria Solar I — Under construction · Solar · TX · 250 MW · 7.0 mi awayTX17 Nickel Prairie Storage — Postponed · Storage · TX · 100 MW · 8.8 mi awayBodkin BESS — Permitted · Storage · TX · 75 MW · 9.0 mi awayNash Solar — Under construction · Solar · TX · 10 MW · 10.2 mi awayCottonwood Bayou Solar — Built · Solar · TX · 351.4 MW · 10.7 mi awayBrazos River BESS LLC — Contracted · Storage · TX · 180.4 MW · 12.7 mi awayCastor — Under construction · Storage · TX · 200 MW · 14.3 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Winmil Clean Energy Center (BESS)

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
-277 MWh
Grid
12 kV to CenterPoint Energy (ERCO)
Location
Brazoria County, Texas
Operated by
On Energy StorageSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-277
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -277.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Myrtle Solar, LLC Under construction Solar 0.2 mi 313
Windmill Ridge Storage Postponed Storage 2.2 mi 151.4
Cradle Solar Postponed Solar 4.8 mi 225
Rock N' Roll Studied Solar + storage 5.1 mi 358
Brazoria Solar I Under construction Solar 7.0 mi 250
TX17 Nickel Prairie Storage Postponed Storage 8.8 mi 100
Bodkin BESS Permitted Storage 9.0 mi 75
Nash Solar Under construction Solar 10.2 mi 10
Cottonwood Bayou Solar Built Solar 10.7 mi 351.4
Brazos River BESS LLC Contracted Storage 12.7 mi 180.4
Castor Under construction Storage 14.3 mi 200

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution