Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Wolverine-Loop System: route and 14 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Wolverine-Loop System
Petroleum product pipeline
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-IN, US-MI
- Operated by
- Wolverine Pipeline COSourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 65
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | WOLVERINE PIPELINE CO |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Wolverine-Loop System |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Champion Solar I Postponed | Solar | 0.2 km | 51.9 |
| DATA CENTER Built | Large load | 1.2 km | |
| St Joseph Energy Center Postponed | Gas, combined cycle | 3.5 km | 1,406 |
| AMAZON DATA SERVICES INCORPORATED Built | Large load | 4.3 km | |
| Crawler Crane (Michigan City data centre) Filed | Large load | 7.3 km | |
| LAVENDER FIELDS HOLDINGS LLC Built | Large load | 7.3 km | |
| HOBART DATA CENTER MASS GRADING - 1 Under construction | Large load | 9.5 km | |
| LPO DC CAMPUS Under construction | Large load | 10.1 km | |
| W 167th St Under construction | Solar | 13.9 km | 1.5 |
| Merrillville Solar Announced | Solar | 14.3 km | 100 |
| Steger Under construction | Solar | 18.1 km | 2 |
| Robbins Community Power LLC Postponed | Biomass | 20.2 km | 55 |
| Gemstone Solar LLC Permitted | Solar | 20.9 km | 150 |
| Falconhead Solar, LLC Under construction | Solar | 24.5 km | 5 |
Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air · FAA OE/AAA
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)