Works 4
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1974
- Net generation, 2025
- 56 MWh
- Grid
- 138 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Wichita County, Texas
- Operated by
- Vitro Architectural GlassSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 52 years since 1974
- Heat rate
- 10,625 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 595 |
| Capacity factor, 2025 | 0.001 |
| Heat rate (Btu/kWh), 2025 | 10,625 |
| Net generation (MWh), 2025 | 56 |
| Balancing authority code | ERCO |
Retirement
- Capacity retired
- 1.1 MW
- Generators retired
- 1
- Next scheduled retirement
- November 2029
- Capacity scheduled to retire
- 2 MW
- Generators scheduled to retire
- 1
- Share of in-service capacity scheduled
- 41%
- Capacity still in service
- 4.9 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| L2PG | Petroleum Liquids | 1.1 MW | Retired | January 2018 |
| L2G | Petroleum Liquids | 2 MW | Scheduled to retire | November 2029 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- Oncor Electric Delivery Company LLC
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
Transmission lines within 15 mi (10)
- 138 kV line (OSM way 1339707951)
- 138 kV line (OSM way 1339707953)
- Power line, voltage not stated (OSM way 1124325455)
- 138 kV line (OSM way 1339707958)
- 138 kV line (OSM way 1339707950)
- 138 kV line (OSM way 1124325454)
- Power line, voltage not stated (OSM way 1124325445)
- 138 kV line (OSM way 1124325447)
- American Electric Power 345 kV line (OSM way 168061183)
- 138 kV line (OSM way 1339707948)
Connection points within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit L2G scheduled to retire, 2 MW · EIA-860M
- Stated Unit L2PG scheduled to retire, 1.1 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- ERCOT
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Short Creek Solar Contracted | Solar + storage | 14.2 mi | 783.5 |