Xinjiang Hutubi Source-Grid-Load-Storage solar power plant — Power plant · Solar · Xinjiang Zhongxin Electrical Energy Investment Co LtdDatang Hutubi power station Phase II Unit 3 — Canceled · Coal · China · 660 MW · 21.7 km awayDatang Hutubi power station Phase II Unit 4 — Canceled · Coal · China · 660 MW · 21.7 km awayXinjiang Jiarun power station Unit 5 — Canceled · Coal · China · 350 MW · 22.7 km awayXinjiang Jiarun power station Unit 7 — Canceled · Coal · China · 350 MW · 22.7 km awayXinjiang Jiarun power station Unit 6 — Canceled · Coal · China · 350 MW · 22.7 km awayXinjiang Jiarun power station Unit 8 — Canceled · Coal · China · 350 MW · 22.7 km away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Xinjiang Hutubi Source-Grid-Load-Storage solar power plant

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Commissioned
2025
Location
Xinjiang, China

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “utility-scale solar / PV”
Age
1 year since 2025
Units
1
1 attribute from Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Attributes
AttributeValue
Gem
Owners
Name
China Power Hutubi New Energy
Unit ids
G100000813876
Location id
L100000811389
Subnational
Xinjiang
Unit statuses
Operating
1
Location accuracy
exact

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleSource
China Power Hutubi New Energy Owner GEM
Xinjiang Zhongxin Electrical Energy Investment Co Ltd Operator GEM

Timeline

  • In service · GEM

Sources

2 sources

Sources GEM · Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Datang Hutubi power station Phase II Unit 3 Canceled Coal 21.7 km 660
Datang Hutubi power station Phase II Unit 4 Canceled Coal 21.7 km 660
Xinjiang Jiarun power station Unit 5 Canceled Coal 22.7 km 350
Xinjiang Jiarun power station Unit 7 Canceled Coal 22.7 km 350
Xinjiang Jiarun power station Unit 6 Canceled Coal 22.7 km 350
Xinjiang Jiarun power station Unit 8 Canceled Coal 22.7 km 350

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution