Show on map
Xinjiang Ürümqi Wulabo distributed wind farm — Power plant · Wind · Ürümqi Power Investment Energy TechnologyXinjiang Dabancheng (Xinjiang Wind) First wind farm 2RP — Under construction · Wind · China · 102.5 MW · 10.6 km awayXinjiang Urumqi Dabancheng Third (Longyuan) wind farm 3RP — Announced · Wind · China · 100 MW · 14.2 km awayXinjiang Urumqi Dabancheng Third (Longyuan) wind farm 4RP — Announced · Wind · China · 100 MW · 17.1 km awayHongyanchi-1 power station Expansion Phase II Unit 13 — Canceled · Coal · China · 330 MW · 17.7 km awayHongyanchi-1 power station Expansion Phase II Unit 12 — Canceled · Coal · China · 330 MW · 17.7 km awayHongyanchi-2 power station Phase II Unit 5 — Canceled · Coal · China · 330 MW · 19.5 km awayHongyanchi-2 power station Phase II Unit 6 — Canceled · Coal · China · 330 MW · 19.5 km away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Xinjiang Ürümqi Wulabo distributed wind farm

Power plant · Wind

Key facts

Power plant · Wind Operating
Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Commissioned
2025
Location
Xinjiang, China

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “wind / Onshore”
Age
1 year since 2025
Units
1
1 attribute from Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Attributes
AttributeValue
Gem
Owners
Name
China Power Investment Group Xinjiang Energy Chemical Group Co Ltd
Unit ids
G100001030280
Location id
L100001025585
Subnational
Xinjiang
Unit statuses
Operating
1
Location accuracy
exact

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleSource
China Power Investment Group Xinjiang Energy Chemical Group Co Ltd Owner GEM
Ürümqi Power Investment Energy Technology Operator GEM

Timeline

  • In service · GEM

Sources

2 sources

Sources GEM · Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Xinjiang Dabancheng (Xinjiang Wind) First wind farm 2RP Under construction Wind 10.6 km 102.5
Xinjiang Urumqi Dabancheng Third (Longyuan) wind farm 3RP Announced Wind 14.2 km 100
Xinjiang Urumqi Dabancheng Third (Longyuan) wind farm 4RP Announced Wind 17.1 km 100
Hongyanchi-1 power station Expansion Phase II Unit 13 Canceled Coal 17.7 km 330
Hongyanchi-1 power station Expansion Phase II Unit 12 Canceled Coal 17.7 km 330
Hongyanchi-2 power station Phase II Unit 5 Canceled Coal 19.5 km 330
Hongyanchi-2 power station Phase II Unit 6 Canceled Coal 19.5 km 330

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution