- Combustion
- Retired
- 10 · 100 · 1,000 MW
Map
- Combustion
- Retired
Yuma: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Yuma
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2006 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1937
- Net generation, 2006
- 8 MWh
- Location
- Yuma County, Colorado
- Operated by
- City of Yuma - (CO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 89 years since 1937
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | WACM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2013
- Capacity retired
- 1 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Petroleum Liquids | 0.1 MW | Retired | May 2013 |
| 2 | Petroleum Liquids | 0.1 MW | Retired | May 2013 |
| 3 | Petroleum Liquids | 0.3 MW | Retired | May 2013 |
| 4 | Petroleum Liquids | 0.5 MW | Retired | May 2013 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- WACM
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2, 3, 4 scheduled to retire, 1 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory