- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Zeeland: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Zeeland
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 0% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1957
- Net generation, 2025
- 600 MWh
- Grid
- 12 kV to City of Zeeland - (MI) (MISO)
- Location
- Ottawa County, Michigan
- Operated by
- City of Zeeland - (MI)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 69 years since 1957
- Heat rate
- 20,323 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 12,194 |
| Capacity factor, 2025 | 0.003 |
| Heat rate (Btu/kWh), 2025 | 20,323.3 |
| Net generation (MWh), 2025 | 600 |
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- June 2032
- Last scheduled retirement
- June 2045
- Capacity scheduled to retire
- 22.3 MW
- Generators scheduled to retire
- 7
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 22.3 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 7 | Natural Gas Internal Combustion Engine | 2 MW | Scheduled to retire | June 2032 |
| 8 | Natural Gas Internal Combustion Engine | 1.7 MW | Scheduled to retire | June 2032 |
| 1 | Natural Gas Internal Combustion Engine | 1.4 MW | Scheduled to retire | June 2040 |
| 2 | Natural Gas Internal Combustion Engine | 1.1 MW | Scheduled to retire | June 2040 |
| 10 | Natural Gas Internal Combustion Engine | 5.6 MW | Scheduled to retire | June 2045 |
| 11 | Natural Gas Internal Combustion Engine | 6 MW | Scheduled to retire | June 2045 |
| 9 | Natural Gas Internal Combustion Engine | 4.5 MW | Scheduled to retire | June 2045 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV
- Transmission or distribution system owner
- City of Zeeland - (MI)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- RFC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 10, 11, 9 scheduled to retire, 16.1 MW · EIA-860M
- Stated Units 1, 2 scheduled to retire, 2.5 MW · EIA-860M
- Stated Units 7, 8 scheduled to retire, 3.7 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory