Show on map
Zephyr Wind — Power plant · Wind · Findlay Wind 19, LLCBorder Basin Solar — Under construction · Solar · OH · 120 MW · 3.7 mi awaySouth Branch Solar — Filed · Solar · OH · 115 MW · 6.9 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Zephyr Wind

Power plant · Wind

Key facts

Power plant · Windran 17% of 2024 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2024
6,654 MWh
Grid
34 kV to Ohio Power Co (PJM)
Location
Hancock County, Ohio

Output

Net generation MWh by year, 2015 to 2024

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
11 years since 2015
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019827, G100001023066, G100001023067
Location id
L100001017838
Eia plant ids
60128
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Ohio Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Balancing authority codePJM

Wind turbines

Turbines
3
Turbine capacity (MW)
4.5
Turbine models
3 Goldwind GW87
Hub height (m)
80
Rotor diameter (m)
87
Year online
2015

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Findlay Wind 19, LLC Operator EIA-860M
One Energy Capital LLC Owner 66.7% Dec 31, 2025 EIA-860
Craig A Stoller Revocable Living Trust Owner Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Border Basin Solar Under construction Solar 3.7 mi 120
South Branch Solar Filed Solar 6.9 mi 115

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution