ASUK Holdco 1 Limited
- Wind & solar
- In development
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
1 project
1 project. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
As filed: ASUK HOLDCO 1 LIMITED
Key facts
No parent recordedLike 48,147 of 50,300 companies here. Why- Registered in
- United States
On the map, by stage
On the map, by stage
| Stage | Sites | MW | No MW |
|---|---|---|---|
| Planned | 1 | 70 | 0 |
| Under construction | 0 | 0 | 0 |
| Operating | 0 | 0 | 0 |
| Idling or retired | 0 | 0 | 0 |
Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.
Projects 1
Capacity
70 MW
70 MW active
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Filed | Tormsdale Windfarm | Solar + storage | 70 MW | United Kingdom | Online Jun 30, 2028 | NESO |
Supported by National Energy SO Open Data
Sources 2
Registers
2
Reuse terms
- 2 Open license, with credit
Latest read
2026-11-27
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
NESO ·
NESO Transmission Entry Capacity (TEC) Register
National Energy SO Open Data Licence v1.0 (based on OGL v3), retrieved 2026-09-12 — free to "exploit the Information commercially and non-commercially"; must "Acknowledge NESO as the source of the Information by including the following attribution statement: Supported by National Energy SO Open Data"
Supported by National Energy SO Open Data · license
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).