Bavona hydroelectric plant — Power plant · Hydro · Officine Idroelettriche della Maggia SA (OFIMA)Biasca hydroelectric plant — Power plant · Hydro · Officine Idroelettriche di Blenio SA (OFIBLE)Cavergno hydroelectric plant — Power plant · Hydro · Officine Idroelettriche della Maggia SA (OFIMA)Gordola hydroelectric plant — Power plant · Hydro · Azienda Elettrica Ticinese (AET)Olivone hydroelectric plant — Power plant · Hydro · Officine Idroelettriche di Blenio SA (OFIBLE)Robiei hydroelectric plant — Power plant · Pumped hydro storage · Officine Idroelettriche della Maggia SA (OFIMA)Verbano 1 hydroelectric plant — Power plant · Hydro · Officine Idroelettriche della Maggia SA (OFIMA)Peccia hydroelectric plant — Power plant · Pumped hydro storage · Maggia Hydroelectric WorksRitom Nuova hydroelectric plant — Under construction · Under construction · Pumped hydro storage · 120 MWParco Solare Alpino Duragno solar project -- — Announced · Solar · Switzerland · 9.9 MW · 10.0 km awayPVA Gries solar project -- — Announced · Solar · Switzerland · 8.8 MW · 10.8 km awayRitom Nuova hydroelectric plant — Under construction · Pumped hydro storage · Switzerland · 120 MW · 12.4 km awayNalpSolar solar project -- — Announced · Solar · Switzerland · 8.1 MW · 17.6 km awayGrimsel 4 hydroelectric plant — Announced · Hydro · Switzerland · 118 MW · 19.6 km awaySolara Magriel solar project -- — Announced · Solar · Switzerland · 9 MW · 21.8 km awaySedrunSolar solar project -- — Announced · Solar · Switzerland · 19.2 MW · 23.1 km away
  • Clean firm
  • Storage
  • Under construction
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Canton of Ticino

Show on map

Follow this company

Power plant owner

Key facts

Power plant ownerNo parent recordedLike 48,147 of 50,300 companies here. Why
Registered in
United States

On the map, by stage

Assets 8

Assets

8

Capacity

1.2 GW

GW by technology
  1. Hydro: 0.9 GW, 6 assets
  2. Pumped hydro storage: 0.2 GW, 2 assets

Owns 8 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Biasca hydroelectric plant Hydro Owns 324 MW — 20.0% Canton of Ticino
Robiei hydroelectric plant Pumped hydro storage Owns 192 MW — 20.0% Canton of Ticino
Bavona hydroelectric plant Hydro Owns 140 MW — 20.0% Canton of Ticino
Gordola hydroelectric plant Hydro Owns 133 MW — 33.0% Canton of Ticino
Verbano 1 hydroelectric plant Hydro Owns 119 MW — 20.0% Canton of Ticino
Cavergno hydroelectric plant Hydro Owns 114 MW — 20.0% Canton of Ticino
Olivone hydroelectric plant Hydro Owns 102 MW — 20.0% Canton of Ticino
Peccia hydroelectric plant Pumped hydro storage Owns 54 MW — 20.0% Canton of Ticino

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 7

within 25 km

Projects

7

within 25 km

Nearest

10.0 km

Parco Solare Alpino Duragno solar project --

All 7NearbyShowing all 7 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Parco Solare Alpino Duragno solar project -- Solar 9.9 MW 10.0 km away nearest: Gordola hydroelectric plant
Announced PVA Gries solar project -- Solar 8.8 MW 10.8 km away nearest: Robiei hydroelectric plant
Under construction Ritom Nuova hydroelectric plant Pumped hydro storage 120 MW 12.4 km away nearest: Peccia hydroelectric plant
Announced NalpSolar solar project -- Solar 8.1 MW 17.6 km away nearest: Olivone hydroelectric plant
Announced Grimsel 4 hydroelectric plant Hydro 118 MW 19.6 km away nearest: Robiei hydroelectric plant
Announced Solara Magriel solar project -- Solar 9 MW 21.8 km away nearest: Olivone hydroelectric plant
Announced SedrunSolar solar project -- Solar 19.2 MW 23.1 km away nearest: Olivone hydroelectric plant

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution