County of Miami-DADE Florida
- Bioenergy
- Retired
- Other infrastructure
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Retired
- Other infrastructure
- Other companies nearby
2 assets
2 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
RNG developer and Power plant owner
As filed: COUNTY OF MIAMI-DADE FLORIDA
Key facts
RNG developer and Power plant ownerNo parent recordedLike 48,147 of 50,300 companies here. Why- States
- FL
- Registered in
- United States
On the map, by stage
On the map, by stage
| Stage | Sites | MW | No MW |
|---|---|---|---|
| Planned | 0 | 0 | 0 |
| Under construction | 0 | 0 | 0 |
| Operating | 0 | 0 | 0 |
| Idling or retired | 1 | 77 | 0 |
Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.
Gross output of plants with a stake
1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Bioenergy
Yearly totals
| Year | Bioenergy | Total (MWh) |
|---|---|---|
| 2024 (part year) | 0 | 0 |
| 2023 | 25,506 | 25,506 |
| 2022 | 243,907 | 243,907 |
| 2021 | 300,222 | 300,222 |
| 2020 | 270,801 | 270,801 |
| 2019 | 293,971 | 293,971 |
| 2018 | 312,503 | 312,503 |
| 2017 | 314,441 | 314,441 |
| 2016 | 340,867 | 340,867 |
| 2015 | 349,126 | 349,126 |
| 2014 | 346,190 | 346,190 |
| 2013 | 310,872 | 310,872 |
| 2012 | 330,073 | 330,073 |
| 2011 | 339,933 | 339,933 |
| 2010 | 304,910 | 304,910 |
| 2009 | 284,517 | 284,517 |
| 2008 | 317,459 | 317,459 |
| 2007 | 288,286 | 288,286 |
| 2006 | 305,000 | 305,000 |
| 2005 | 232,784 | 232,784 |
| 2004 | 252,693 | 252,693 |
| 2003 | 291,547 | 291,547 |
| 2002 | 284,724 | 284,724 |
| 2001 | 332,734 | 332,734 |
Assets 2
Assets
2
2 kinds
Capacity
77 MW
1 of 2 give MW
- Waste to energy: 77 MW, 1 asset
Owns 1 power plant · Owns 1 RNG project
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Miami Dade County Resource Recovery Fac | Waste to energy | Owns | 77 MW | US-FL | 100.0% | COUNTY OF MIAMI-DADE FLORIDA |
| Project #1 - South Dade Solid Waste Disposal Facility | RNG project | Owns | — | US-FL | 100.0% | COUNTY OF MIAMI-DADE FLORIDA |
Sources EIA-860M · GEM · EPA LMOP
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EPA LMOP
Sources 3
Registers
3
Reuse terms
- 2 Open license
- 1 Open license, with credit
Latest read
2026-11-13
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
EPA LMOP ·
EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
US federal work — public domain under 17 U.S.C. §105 for EPA-authored data; EPA's copyright-status page hedges ("Commercial use of the documents available from the EPA websites may be protected"), quoted and assessed in docs/13-legal-data-rights.md section 2.12; counsel item 7.x before publication
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 3
within 15 miProjects
3
within 15 mi
Nearest
3.3 mi
DORAL DATA CENTER PARKING LOT IMPROVEMENTS
All 3NearbyShowing all 3 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Built | Doral Data Center Parking Lot Improvements | Large load | — | 3.3 mi away | nearest: Miami Dade County Resource Recovery Fac |
| Built | Iron Mountain Data Center MIA-1 | Large load | — | 7.6 mi away | nearest: Miami Dade County Resource Recovery Fac |
| Under construction | Comcast Miramar Data Center | Large load | — | 10.5 mi away | nearest: Miami Dade County Resource Recovery Fac |
Sources EPA ICIS-NPDES · FAA OE/AAA