Edgecombe Genco LLC — Power plant · Coal · Edgecombe Operating Services LLCCarter Solar — Postponed · Solar · NC · 5 MW · 7.9 mi awayEdgecombe Solar LLC — Under construction · Solar · NC · 75 MW · 8.0 mi awayEnfield Farm — Postponed · Solar · NC · 5 MW · 11.1 mi awaySweetleaf Solar LLC — Permitted · Solar · NC · 93 MW · 13.2 mi awayClayton Solar — Postponed · Solar · NC · 5 MW · 13.5 mi away
  • Combustion
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Edgecombe Manager, LLC

Follow this company

Power plant owner

Key facts

Power plant owner · 114.8 MW
Assets
1
States
NC
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2019
  • Coal
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearCoalTotal (MWh)
201900
20189,0829,082
20177,9007,900
201613,01813,018
201578,47878,478
2014108,885108,885
201393,40293,402
2012123,466123,466
2011427,601427,601
2010531,090531,090
2009416,104416,104
2008670,679670,679
2007749,168749,168
2006729,050729,050
2005892,219892,219
2004893,747893,747
2003907,503907,503
2002804,054804,054
2001876,468876,468

Sources EIA-860M · EIA · EPA GHGRP

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Assets 1

Assets

1

Capacity

115 MW

MW by fuel
  1. Coal: 115 MW, 1 asset

Owns 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 5

within 15 mi

Projects

5

within 15 mi

Nearest

7.9 mi

Carter Solar

All 5NearbyShowing all 5 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Carter Solar Solar 5 MW 7.9 mi away nearest: Edgecombe Genco LLC
Under construction Edgecombe Solar LLC Solar 75 MW 8.0 mi away nearest: Edgecombe Genco LLC
Postponed Enfield Farm Solar 5 MW 11.1 mi away nearest: Edgecombe Genco LLC
Permitted Sweetleaf Solar LLC Solar 93 MW 13.2 mi away nearest: Edgecombe Genco LLC
Postponed Clayton Solar Solar 5 MW 13.5 mi away nearest: Edgecombe Genco LLC

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution