Soto de Ribera power station — Power plant · Gas, combined cycleLares power station — Power plant · Gas, combined cycleRibatejo power station — Power plant · Gas, combined cycleFisigen power station — Power plant · Gas, combustion turbineAguieira hydroelectric plant — Power plant · Pumped hydro storageAlqueva I hydroelectric plant — Power plant · Pumped hydro storageAlqueva II hydroelectric plant — Power plant · Pumped hydro storageAlto Lindoso hydroelectric plant — Power plant · StorageBelver hydroelectric plant — Power plant · StorageCabril hydroelectric plant — Power plant · StorageCarrapatelo hydroelectric plant — Power plant · HydroCastelo De Bode hydroelectric plant — Power plant · StorageCrestuma-Lever hydroelectric plant — Power plant · HydroFratel hydroelectric plant — Power plant · HydroPocinho hydroelectric plant — Power plant · HydroRégua hydroelectric plant — Power plant · HydroSalamonde II hydroelectric plant — Power plant · Pumped hydro storageTorrão hydroelectric plant — Power plant · Pumped hydro storageValeira hydroelectric plant — Power plant · HydroVenda Nova hydroelectric plant — Power plant · StorageVenda Nova II hydroelectric plant — Power plant · Pumped hydro storageVenda Nova III hydroelectric plant — Power plant · Pumped hydro storage · EDPR Renewable Energy Sources of Greece 1 Sole ProprietorshipVilarinho Das Furnas hydroelectric plant — Power plant · Pumped hydro storageSalime hydroelectric plant — Power plant · Storage · Enel Green PowerTanes hydroelectric plant — Power plant · Pumped hydro storageAlto Rabagão hydroelectric plant — Power plant · Pumped hydro storage · EDPCaniçada hydroelectric plant — Power plant · Storage · EDPParadela hydroelectric plant — Power plant · Storage · EDPRibeiradio hydroelectric plant — Power plant · Storage · EDPVilar-Tabuaço hydroelectric plant — Power plant · Storage · EDPMiranda Belmonte hydroelectric plant — Power plant · HydroBrux wind farm — Power plant · Wind · EDPBouçã hydroelectric plant — Power plant · Storage · EDPCaldeirão hydroelectric plant — Power plant · StoragePracana hydroelectric plant — Power plant · Storage · EDPSalamonde hydroelectric plant — Power plant · Storage · EDPVientos de Tatal wind farm -- — Announced · Announced · Wind · 256 MWPuente Nuevo Biomass power station 1 — Announced · Announced · Biomass · 50 MWAlto do Rabagao Floating solar farm -- — Announced · Solar · Portugal · 42 MW · 0.1 km awayAlqueva Dam Floating solar farm 2 — Announced · Solar · Portugal · 52 MW · 0.4 km awayLa Pereda Hunosa power station Unit 1, timepoint 2 — Under construction · Biomass · Spain · 50 MW · 6.9 km awayMargalha solar farm -- — Under construction · Solar · Portugal · 120 MW · 9.4 km awayLas Américas 12 wind farm -- — Announced · Wind · Spain · 50 MW · 12.4 km awayCarregado solar farm -- — Under construction · Solar · Portugal · 64 MW · 13.0 km awayEscorpio wind farm -- — Announced · Wind · Spain · 27 MW · 14.7 km awaySerra de Liñares wind farm -- — Announced · Wind · Spain · 50.4 MW · 17.2 km awayLousada solar farm -- — Announced · Solar · Portugal · 36.9 MW · 18.2 km awayPeña Bou wind farm -- — Announced · Wind · Spain · 13.2 MW · 19.5 km awayCarrugueiro wind farm -- — Announced · Wind · Spain · 13.5 MW · 19.7 km awayBrañadesella wind farm -- — Announced · Wind · Spain · 25 MW · 19.8 km awayTuría wind farm -- — Announced · Wind · Spain · 18 MW · 20.9 km awayChao Gran wind farm -- — Announced · Wind · Spain · 18 MW · 21.0 km awayNimbus (Spain) wind farm -- — Announced · Wind · Spain · 12 MW · 23.8 km awayMuracais wind farm -- — Announced · Wind · Spain · 52.8 MW · 23.8 km awayViento de Castelo wind farm -- — Announced · Wind · Spain · 12 MW · 24.2 km awayLa Artosa wind farm -- — Announced · Wind · Spain · 28 MW · 24.8 km awayHerradura wind farm -- — Announced · Wind · Spain · 15 MW · 24.9 km away
  • Combustion
  • Clean firm
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

Key facts

Power plant owner · 8,502.5 MW
Capacity held
8,502.5MW
Assets
36
Projects
2
Companies below
1
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Sources 2

Registers

2

Reuse terms

  • 1 Open license
  • 1 Open license, with credit

Latest read

2026-11-04

From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.

Sources

  • GEM ·

    Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

    Open license, with credit · retrieved Oct 26, 2026

    Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license

    In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • Wikidata ·

    Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)

    Open license · retrieved Nov 4, 2026

    Source: Wikidata (CC0) · license

    Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."

    Summary only: the source’s license keeps the full record at the source.

    View at source →

Around this company

Nearby 19

within 25 km

Projects

19

within 25 km

Nearest

0.1 km

Alto do Rabagao Floating solar farm --

All 19NearbyShowing all 19 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Alto do Rabagao Floating solar farm -- Solar 42 MW 0.1 km away nearest: Alto Rabagão hydroelectric plant
Announced Alqueva Dam Floating solar farm 2 Solar 52 MW 0.4 km away nearest: Alqueva I hydroelectric plant
Under construction La Pereda Hunosa power station Unit 1, timepoint 2 Biomass 50 MW 6.9 km away nearest: Soto de Ribera power station
Under construction Margalha solar farm -- Solar 120 MW 9.4 km away nearest: Belver hydroelectric plant
Announced Las Américas 12 wind farm -- Wind 50 MW 12.4 km away nearest: Salime hydroelectric plant
Under construction Carregado solar farm -- Solar 64 MW 13.0 km away nearest: Ribatejo power station
Announced Escorpio wind farm -- Wind 27 MW 14.7 km away nearest: Salime hydroelectric plant
Announced Serra de Liñares wind farm -- Wind 50.4 MW 17.2 km away nearest: Salime hydroelectric plant
Announced Lousada solar farm -- Solar 36.9 MW 18.2 km away nearest: Torrão hydroelectric plant
Announced Peña Bou wind farm -- Wind 13.2 MW 19.5 km away nearest: Salime hydroelectric plant
Announced Carrugueiro wind farm -- Wind 13.5 MW 19.7 km away nearest: Salime hydroelectric plant
Announced Brañadesella wind farm -- Wind 25 MW 19.8 km away nearest: Salime hydroelectric plant
Announced Turía wind farm -- Wind 18 MW 20.9 km away nearest: Salime hydroelectric plant
Announced Chao Gran wind farm -- Wind 18 MW 21.0 km away nearest: Salime hydroelectric plant
Announced Nimbus (Spain) wind farm -- Wind 12 MW 23.8 km away nearest: Salime hydroelectric plant
Announced Muracais wind farm -- Wind 52.8 MW 23.8 km away nearest: Salime hydroelectric plant
Announced Viento de Castelo wind farm -- Wind 12 MW 24.2 km away nearest: Salime hydroelectric plant
Announced La Artosa wind farm -- Wind 28 MW 24.8 km away nearest: Miranda Belmonte hydroelectric plant
Announced Herradura wind farm -- Wind 15 MW 24.9 km away nearest: Salime hydroelectric plant

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution