La Cygne — Power plant · Coal · Evergy MetroLawrence Energy Center — Power plant · Coal · Evergy Kansas Central, IncGordon Evans Energy Center — Power plant · Gas, combustion turbine · Evergy Kansas South, IncLake Road (MO) — Power plant · Gas, steam turbine · Evergy Missouri WestHawthorn — Power plant · Coal · Evergy MetroIatan — Power plant · Coal · Evergy MetroJeffrey Energy Center — Power plant · Coal · Evergy Kansas Central, IncGreenwood (MO) — Power plant · Gas, combustion turbine · Evergy Missouri WestState Line Combined Cycle — Power plant · Gas, combined cycle · Empire District Electric CoWest Gardner — Power plant · Gas, combustion turbine · Evergy MetroSpring Creek Energy Center — Power plant · Gas, combustion turbine · Evergy Kansas Central, IncSouth Harper — Power plant · Gas, combustion turbine · Evergy Missouri WestEmporia Energy Center — Power plant · Gas, combustion turbine · Evergy Kansas Central, IncWILDWOOD DATA CENTER — Under construction · Large load · MO · 0.4 mi awaySwan Solar — Under construction · Solar · MO · 650 MW · 3.2 mi awayORACLE KC-7/8 DATA CENTERS — Built · Large load · MO · 3.6 mi awayORACLE 3200 DATA CENTER — Built · Large load · MO · 3.6 mi awayRiverton — Under construction · Gas, combustion turbine · KS · 27 MW · 4.7 mi awayCUBE NA DATA CENTER COMPANY LLC — Built · Large load · MO · 5.4 mi awayORACLE LEE'S SUMMIT DATA CENTER — Built · Large load · MO · 7.2 mi awayNearman Creek — Postponed · Coal · KS · 316 MW · 12.1 mi awayKANSAS CITY DATA CENTER C (AIR) — Built · Large load · KS · 12.3 mi awayCLOP OLATHE - 10MW DATA CENTER (AIR) — Built · Large load · KS · 12.3 mi awayROCKY BRANCH CREEK DATA CENTER — Under construction · Large load · MO · 13.9 mi awayVELVET TECH SERVICES — Built · Large load · MO · 14.9 mi away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

As filed: EVERGY INC

Key facts

Power plant ownerNo parent recordedLike 48,146 of 50,299 companies here. Why
States
KS, MO, OK
Companies below
4
Headquarters
Topeka, United States Source: Wikidata
Listed
Nasdaq: EVRG Source: SEC EDGAR
LEI
549300PGTHDQY6PSUI61 Source: Wikidata

On the map, by stage

Gross output of plants with a stake

13 of 13 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 13 of 13 plants with a stake: US plants with an EIA monthly series.75% of the output is from 11 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2026
  • Gas
  • Coal
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasCoalTotal (MWh)
2026 (part year)2,720,06418,512,22021,232,284
20254,028,79425,108,31229,137,106
20245,414,01218,690,03824,104,050
20234,741,23021,413,71126,154,941
20223,479,19926,872,29630,351,495
20212,638,06627,324,29129,962,357
20203,355,69123,903,07227,258,763
20194,170,63726,447,80230,618,439
20183,859,84128,621,07332,480,914
20173,115,77631,361,67934,477,455
20163,117,47333,148,76436,266,237
20152,626,64433,686,85936,313,503
20142,680,21735,681,38938,361,606
20133,486,90739,133,87042,620,777
20123,785,55938,767,81442,553,373
20113,771,75438,316,69842,088,452
20103,500,78236,453,53639,954,318
20092,765,85733,485,17536,251,032
20083,790,91534,950,45838,741,373
20073,671,25937,230,93140,902,190
20062,887,93136,167,71539,055,646
20053,403,31836,532,09139,935,409
20042,528,71623,070,83425,599,550
20032,308,19937,427,04239,735,241
20023,076,27336,983,35640,059,629
20012,345,19132,124,37634,469,567

Sources EIA-860M · EIA · EPA GHGRP

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Sources 4

Registers

4

Reuse terms

  • 3 Open license
  • 1 Open license, with credit

Latest read

2026-11-04

From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.

Sources

  • EIA-860M ·

    EIA-860M Preliminary Monthly Electric Generator Inventory

    Open license · retrieved Oct 30, 2026

    US federal work — public domain

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • GEM ·

    Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

    Open license, with credit · retrieved Oct 26, 2026

    Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license

    In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • Wikidata ·

    Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)

    Open license · retrieved Nov 4, 2026

    Source: Wikidata (CC0) · license

    Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • SEC EDGAR ·

    SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)

    Open license · retrieved Nov 4, 2026

    Source: U.S. Securities and Exchange Commission, EDGAR · license

    SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).

    Summary only: the source’s license keeps the full record at the source.

    View at source →

Around this company

Nearby 12

within 15 mi

Projects

12

within 15 mi

Nearest

0.4 mi

WILDWOOD DATA CENTER

All 12NearbyShowing all 12 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Wildwood Data Center Large load — 0.4 mi away nearest: State Line Combined Cycle
Under construction Swan Solar Solar 650 MW 3.2 mi away nearest: La Cygne
Built Oracle KC-7/8 Data Centers Large load — 3.6 mi away nearest: Hawthorn
Built Oracle 3200 Data Center Large load — 3.6 mi away nearest: Hawthorn
Under construction Riverton Gas, combustion turbine 27 MW 4.7 mi away nearest: State Line Combined Cycle
Built CUBE NA Data Center Company LLC Large load — 5.4 mi away nearest: Hawthorn
Built Oracle Lee's Summit Data Center Large load — 7.2 mi away nearest: Greenwood (MO)
Postponed Nearman Creek Coal 316 MW 12.1 mi away nearest: Hawthorn
Built Kansas City Data Center C (Air) Large load — 12.3 mi away nearest: West Gardner
Built CLOP Olathe - 10MW Data Center (Air) Large load — 12.3 mi away nearest: West Gardner
Under construction Rocky Branch Creek Data Center Large load — 13.9 mi away nearest: Hawthorn
Built Velvet Tech Services Large load — 14.9 mi away nearest: Greenwood (MO)

Sources EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air