Guangxi Fangchenggang Shenglong Metallurgical Gas Power Project — Power plant · Gas, steam turbineFangchenggang Qisha power station Phase III Unit 5 — Coal · China · 1,000 MW · 9.7 km awayFangchenggang nuclear power plant 3-5 — Announced · Nuclear · China · 1,150 MW · 15.3 km awayFangchenggang nuclear power plant 3-6 — Announced · Nuclear · China · 1,150 MW · 15.3 km awayQinzhou-III power station Phase III Unit 3 — Under construction · Coal · China · 660 MW · 23.8 km awayQinzhou-III power station Phase III Unit 4 — Under construction · Coal · China · 660 MW · 23.8 km awayQinzhou Cogen power station Unit 1 — Canceled · Coal · China · 350 MW · 24.3 km awayQinzhou Cogen power station Unit 2 — Canceled · Coal · China · 50 MW · 24.3 km awayQinzhou Cogen power station Unit 3 — Canceled · Coal · China · 50 MW · 24.3 km away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Guangxi Shenglong Metallurgical Co Ltd

Show on map

Follow this company

Power plant owner

Key facts

Power plant ownerNo parent recordedLike 48,145 of 50,298 companies here. Why
Assets
1
Headquarters
Fangchenggang, China Source: Wikidata

Assets 1

Assets

1

Capacity

655 MW

MW by fuel
  1. Gas, steam turbine: 655 MW, 1 asset

Owns 1 power plant

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 8

within 25 km

Projects

8

within 25 km

Nearest

9.7 km

Fangchenggang Qisha power station Phase III Unit 5

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution