Chuangyuan Smelter power station — Power plant · CoalInner Mongolia Tongliao (Chuangyuan) Source-Grid-Load-Storage wind farms — Power plant · Wind · Inner Mongolia Chuangyuan Alloy LimitedHuolinhe power station Phase II Unit 3 — Canceled · Coal · China · 1,000 MW · 12.1 km awayHuolinhe power station Phase II Unit 4 — Canceled · Coal · China · 1,000 MW · 12.1 km awayHuolinhe Zhanute power station Phase III Unit 10 — Canceled · Coal · China · 660 MW · 13.6 km awayHuolinhe Zhanute power station Phase III Unit 8 — Canceled · Coal · China · 660 MW · 13.6 km awayHuolinhe Zhanute power station Phase III Unit 9 — Canceled · Coal · China · 660 MW · 13.6 km awayHuolinhe Zhanute power station Phase III Unit 7 — Canceled · Coal · China · 660 MW · 13.6 km away
  • Combustion
  • Wind & solar
  • Operating
  • Approximate location
  • 10 · 100 · 1,000 MW

Inner Monglia Chuangyuan Metal Co Ltd

Show on map

Follow this company

Power plant owner

Key facts

Power plant owner
Registered in
United States
Parent
Shandong Innovation Group Co LtdOwnership claimOwnership link recorded from its source; no date stated by the source.

On the map, by stage

Assets 2

Assets

2

Capacity

2.4 GW

GW by technology
  1. Coal: 2.0 GW, 1 asset
  2. Wind: 0.4 GW, 1 asset

Owns 2 power plants

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 6

within 25 km

Projects

6

within 25 km

Nearest

12.1 km

Huolinhe power station Phase II Unit 3

All 6NearbyShowing all 6 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution