CLC Bosila power station — Power plant · Gas, reciprocating engineAminbazar Waste-To-Energy power station 1 — Under construction · Biomass · Bangladesh · 35 MW · 7.4 km awayAminbazar Waste-To-Energy power station 2 — Under construction · Biomass · Bangladesh · 35 MW · 7.4 km away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Maisha Group Ltd

Follow this company

Power plant owner

Key facts

Power plant owner · 105.3 MW
Assets
1
Companies below
1
Registered in
Bangladesh
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Assets 1

Assets

1

Capacity

105 MW

MW by fuel
  1. Gas, reciprocating engine: 105 MW, 1 asset

Owns 1 power plant

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
CLC Bosila power station Gas, reciprocating engine Owns 105.3 MW — 100.0% CLC Power Company Ltd

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 2

within 25 km

Projects

2

within 25 km

Nearest

7.4 km

Aminbazar Waste-To-Energy power station 1

All 2NearbyShowing all 2 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Aminbazar Waste-To-Energy power station 1 Biomass 35 MW 7.4 km away nearest: CLC Bosila power station
Under construction Aminbazar Waste-To-Energy power station 2 Biomass 35 MW 7.4 km away nearest: CLC Bosila power station

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution