South Meadow — Power plant · Oil · NAES CorpCT Resource Rec Authority Facility — Power plant · Waste to energy · NAES CorpTuxpan II power station — Power plant · Gas, combined cycle · NAESTuxpan V power station — Power plant · Gas, combined cycle · NAESHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 1.4 mi awayNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 2.4 mi awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 3.4 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 11.7 mi awayEllington Solar One — Postponed · Solar · CT · 2 MW · 12.1 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 12.4 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 12.7 mi awayCCC Tuxpan I power station 1 — Under construction · Gas, combined cycle · Mexico · 1,151.3 MW · 20.4 km awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 13.7 mi awayElevate Middletown — Announced · Storage · CT · 275 MW · 14.0 mi away
  • Combustion
  • Bioenergy
  • Operating
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

Key facts

Power plant ownerNo parent recordedLike 48,145 of 50,298 companies here. Why
States
CT
Registered in
United States

On the map, by stage

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Not included: 3 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2022
  • Bioenergy
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearBioenergyTotal (MWh)
2022 (part year)119,050119,050
2021249,189249,189
2020268,300268,300
2019252,925252,925
2018220,464220,464
2017315,036315,036
2016338,100338,100
2015309,579309,579
2014375,432375,432
2013347,292347,292
2012391,170391,170
2011387,876387,876
2010386,412386,412
2009401,010401,010
2008372,601372,601
2007361,218361,218
2006408,114408,114
2005411,792411,792
2004410,562410,562
2003450,215450,215
2002492,677492,677
2001499,708499,708

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 4

Assets

4

Capacity

1.2 GW

GW by technology
  1. Gas, combined cycle: 1.0 GW, 2 assets
  2. Oil: 0.2 GW, 1 asset
  3. Waste to energy: 0.1 GW, 1 asset

Operates 4 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Held by
Tuxpan II power station Gas, combined cycle Operates 495 MW — NAES Corp
Tuxpan V power station Gas, combined cycle Operates 495 MW — NAES Corp
South Meadow Oil Operates 167.2 MW US-CT NAES Corp
CT Resource Rec Authority Facility Waste to energy Operates 90 MW US-CT NAES Corp

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 10

within 15 mi (25 km outside the US)

Projects

10

within 15 mi (25 km outside the US)

Nearest

1.4 mi

Hartford Hospital Cogeneration

All 10NearbyShowing all 10 nearby projects.

How these are matched

Exact-grade projects within 15 mi (25 km outside the US) of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi (25 km outside the US) of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Hartford Hospital Cogeneration Gas, combustion turbine 11.5 MW 1.4 mi away nearest: CT Resource Rec Authority Facility
Built NU - Wethersfield Data Center Large load — 2.4 mi away nearest: South Meadow
Postponed Homestead Fuel Cell Gas, other 8.4 MW 3.4 mi away nearest: CT Resource Rec Authority Facility
Postponed Dollar Tree Solar One Solar 2 MW 11.7 mi away nearest: CT Resource Rec Authority Facility
Postponed Ellington Solar One Solar 2 MW 12.1 mi away nearest: CT Resource Rec Authority Facility
Under construction Windsor Locks Solar 1.8 MW 12.4 mi away nearest: CT Resource Rec Authority Facility
Announced CT Airport Authority Solar One Solar 4 MW 12.7 mi away nearest: CT Resource Rec Authority Facility
Under construction CCC Tuxpan I power station 1 Gas, combined cycle 1,151.3 MW 20.4 km away nearest: Tuxpan V power station
Filed Broadleaf Solar Solar 200 MW 13.7 mi away nearest: CT Resource Rec Authority Facility
Announced Elevate Middletown Storage 275 MW 14.0 mi away nearest: South Meadow

Sources EIA-860M · EPA ICIS-Air · GEM

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution