Pleasant Valley Solar 2 Project — Power plant · Solar · PVS 2, LLCClark 2 Solar — Postponed · Solar · ID · 20 MW · 3.7 mi awayClark 4 Solar — Postponed · Solar · ID · 20 MW · 4.0 mi awayClark 1 Solar — Postponed · Solar · ID · 71 MW · 6.7 mi awayClark 3 Solar — Postponed · Solar · ID · 30 MW · 7.7 mi away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

PVS 2, LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 125 MW
Assets
1
States
ID
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2026 to 2026
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
2026 (part year)202,186202,186

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Projects 0

Projects

0

all statuses

Projects sponsored by this company, sorted by capacity, largest first.
Status Name. Sort by name, A to Z Type MW, sorted descending. Sort by capacity, smallest first State Online. Sort by proposed online date, latest first Source
Contracted PVS 2, LLC Solar 125 MW ID Online Apr 15, 2026 LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)

Sources Berkeley Lab

Sources

  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Every source and license · Attribution

Around this company

Nearby 4

within 15 mi

Projects

4

within 15 mi

Nearest

3.7 mi

Clark 2 Solar

All 4NearbyShowing all 4 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Clark 2 Solar Solar 20 MW 3.7 mi away nearest: Pleasant Valley Solar 2 Project
Postponed Clark 4 Solar Solar 20 MW 4.0 mi away nearest: Pleasant Valley Solar 2 Project
Postponed Clark 1 Solar Solar 71 MW 6.7 mi away nearest: Pleasant Valley Solar 2 Project
Postponed Clark 3 Solar Solar 30 MW 7.7 mi away nearest: Pleasant Valley Solar 2 Project

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution