Shaanxi Shenmu Jinjie Beiyuan Chemical solar power plant — Power plant · SolarDaliuta power station Unit 2 — Canceled · Coal · China · 350 MW · 11.4 km awayDaliuta power station Unit 1 — Canceled · Coal · China · 350 MW · 11.4 km awayShaanxi Jingyi Chemical Company captive power station Unit 4 — Canceled · Coal · China · 60 MW · 16.4 km awayShaanxi Jingyi Chemical Company captive power station Unit 3 — Canceled · Coal · China · 60 MW · 16.4 km awayShenmu power station Unit 3-3 — Announced · Coal · China · 660 MW · 19.2 km awayShenmu power station Unit 3-4 — Announced · Coal · China · 660 MW · 19.2 km awayYulin Yushen Qingshui power station Unit 1 — Under construction · Coal · China · 660 MW · 24.2 km awayYulin Yushen Qingshui power station Unit 2 — Under construction · Coal · China · 660 MW · 24.2 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Shaanxi Beiyuan Chemical Group Co Ltd

Show on map

Follow this company

Power plant owner

Key facts

Power plant ownerNo parent recordedLike 48,145 of 50,298 companies here. Why
Assets
1
Registered in
China

Assets 1

Assets

1

Capacity

300 MW

MW by fuel
  1. Solar: 300 MW, 1 asset

Owns 1 power plant

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 8

within 25 km

Projects

8

within 25 km

Nearest

11.4 km

Daliuta power station Unit 2

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution