Shepherd Center — Power plant · Oil · Shepherd CenterDATA CENTER ATLANTA, LLC — Built · Large load · GA · 2.5 mi awayQUALITY INVESTMENT PROPERTIES METRO, LLC — Built · Large load · GA · 2.9 mi awayLeibherr LR 1400 (Atlanta data centre) — Filed · Large load · GA · 3.6 mi awayGOOGLE, INC. — Built · Large load · GA · 11.8 mi awayTA Reality Ellenwood Data Center — Filed · Large load · GA · 12.6 mi awayATL11 DATA CENTER — Built · Large load · GA · 12.7 mi awayFT GIllem MASE Crane (Forest Park data centre) — Filed · Large load · GA · 12.8 mi awayROCK HOUSE ROAD DATA CENTER — Under construction · Large load · GA · 12.8 mi awayVantage Data Center Crane — Under construction · Large load · GA · 13.0 mi awayDeKalb County Green Energy Facility — Postponed · Biomass · GA · 1.6 MW · 13.2 mi awayATL06 DATA CENTER — Under construction · Large load · GA · 13.6 mi awayALIGNED DATA CENTERS ATL01 — Built · Large load · GA · 14.2 mi awayFTY01 DATA CENTER — Under construction · Large load · GA · 14.3 mi awayTRAVELERS DATA CENTER — Built · Large load · GA · 14.7 mi awaySolar BESS Hybrid — Under construction · Gas, combustion turbine · GA · 6 MW · 14.9 mi away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

Key facts

Power plant ownerNo parent recordedLike 48,147 of 50,300 companies here. Why
States
GA
Registered in
United States

On the map, by stage

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2025
  • Oil
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearOilTotal (MWh)
202500
202400
202300
202200
202100
202000
201900
201800
201700
201600
201500
201400
201300
201200
20112020
20102020
20092020
20082020
200733
200622
200533
200400
200300
200200
200100

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

6.0 MW

MW by technology
  1. Oil: 6.0 MW, 1 asset

Operates 1 power plant

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 15

within 15 mi

Projects

15

within 15 mi

Nearest

2.5 mi

DATA CENTER ATLANTA, LLC

All 15NearbyShowing all 15 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Built Data Center Atlanta, LLC Large load — 2.5 mi away nearest: Shepherd Center
Built Quality Investment Properties Metro, LLC Large load — 2.9 mi away nearest: Shepherd Center
Filed Leibherr LR 1400 (Atlanta data centre) Large load — 3.6 mi away nearest: Shepherd Center
Built Google, Inc. Large load — 11.8 mi away nearest: Shepherd Center
Filed TA Reality Ellenwood Data Center Large load — 12.6 mi away nearest: Shepherd Center
Built ATL11 Data Center Large load — 12.7 mi away nearest: Shepherd Center
Filed FT GIllem MASE Crane (Forest Park data centre) Large load — 12.8 mi away nearest: Shepherd Center
Under construction Rock House Road Data Center Large load — 12.8 mi away nearest: Shepherd Center
Under construction Vantage Data Center Crane Large load — 13.0 mi away nearest: Shepherd Center
Postponed DeKalb County Green Energy Facility Biomass 1.6 MW 13.2 mi away nearest: Shepherd Center
Under construction ATL06 Data Center Large load — 13.6 mi away nearest: Shepherd Center
Built Aligned Data Centers ATL01 Large load — 14.2 mi away nearest: Shepherd Center
Under construction FTY01 Data Center Large load — 14.3 mi away nearest: Shepherd Center
Built Travelers Data Center Large load — 14.7 mi away nearest: Shepherd Center
Under construction Solar BESS Hybrid Gas, combustion turbine 6 MW 14.9 mi away nearest: Shepherd Center

Sources EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES · Georgia EPD · EIA-860M

Sources

  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • Georgia EPDOpen license, with credit · retrieved Nov 13, 2026Source: Georgia Environmental Protection Division, Air Protection Branch
  • EIA-860MOpen license · retrieved Nov 4, 2026