Shepherd Center — Power plant · Oil · Shepherd CenterDATA CENTER ATLANTA, LLC — Large load · GA · 4.0 km awayQUALITY INVESTMENT PROPERTIES METRO, LLC — Large load · GA · 4.7 km awayLeibherr LR 1400 (Atlanta data centre) — Large load · GA · 5.8 km awayGOOGLE, INC. — Large load · GA · 19.0 km awayTA Reality Ellenwood Data Center — Large load · GA · 20.3 km awayATL11 DATA CENTER — Large load · GA · 20.4 km awayFT GIllem MASE Crane (Forest Park data centre) — Large load · GA · 20.6 km awayROCK HOUSE ROAD DATA CENTER — Large load · GA · 20.6 km awayVantage Data Center Crane — Large load · GA · 20.9 km awayDeKalb County Green Energy Facility — Biomass · GA · 1.6 MW · 21.3 km awayATL06 DATA CENTER — Large load · GA · 21.9 km awayALIGNED DATA CENTERS ATL01 — Large load · GA · 22.8 km awayFTY01 DATA CENTER — Large load · GA · 23.0 km awayTRAVELERS DATA CENTER — Large load · GA · 23.7 km awaySolar BESS Hybrid — Gas, combustion turbine · GA · 6 MW · 24.0 km away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Shepherd Center

Follow this company

Power plant owner

Key facts

Power plant owner · 6 MW
Assets
1
States
GA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2025
  • Oil
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearOilTotal (MWh)
202500
202400
202300
202200
202100
202000
201900
201800
201700
201600
201500
201400
201300
201200
20112020
20102020
20092020
20082020
200733
200622
200533
200400
200300
200200
200100

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 1

Assets

1

Capacity

6.0 MW

MW by fuel
  1. Oil: 6.0 MW, 1 asset

Operates 1 power plant

Around this company

Nearby 15

within 25 km

Projects

15

within 25 km

Nearest

4.0 km

DATA CENTER ATLANTA, LLC

All 15NearbyShowing all 15 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Built DATA CENTER ATLANTA, LLC Large load — 4.0 km away nearest: Shepherd Center
Built QUALITY INVESTMENT PROPERTIES METRO, LLC Large load — 4.7 km away nearest: Shepherd Center
Filed Leibherr LR 1400 (Atlanta data centre) Large load — 5.8 km away nearest: Shepherd Center
Built GOOGLE, INC. Large load — 19.0 km away nearest: Shepherd Center
Filed TA Reality Ellenwood Data Center Large load — 20.3 km away nearest: Shepherd Center
Built ATL11 DATA CENTER Large load — 20.4 km away nearest: Shepherd Center
Filed FT GIllem MASE Crane (Forest Park data centre) Large load — 20.6 km away nearest: Shepherd Center
Under construction ROCK HOUSE ROAD DATA CENTER Large load — 20.6 km away nearest: Shepherd Center
Under construction Vantage Data Center Crane Large load — 20.9 km away nearest: Shepherd Center
Postponed DeKalb County Green Energy Facility Biomass 1.6 MW 21.3 km away nearest: Shepherd Center
Under construction ATL06 DATA CENTER Large load — 21.9 km away nearest: Shepherd Center
Built ALIGNED DATA CENTERS ATL01 Large load — 22.8 km away nearest: Shepherd Center
Under construction FTY01 DATA CENTER Large load — 23.0 km away nearest: Shepherd Center
Built TRAVELERS DATA CENTER Large load — 23.7 km away nearest: Shepherd Center
Under construction Solar BESS Hybrid Gas, combustion turbine 6 MW 24.0 km away nearest: Shepherd Center