- Combustion
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
- Other companies nearby
1 asset
1 asset. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Shepherd Center
Power plant owner
Key facts
Power plant owner · 6 MW- Assets
- 1
- States
- GA
- Registered in
- United States
- Website
- shepherd.org Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why
Gross output of plants with a stake
1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Oil
Yearly totals
| Year | Oil | Total (MWh) |
|---|---|---|
| 2025 | 0 | 0 |
| 2024 | 0 | 0 |
| 2023 | 0 | 0 |
| 2022 | 0 | 0 |
| 2021 | 0 | 0 |
| 2020 | 0 | 0 |
| 2019 | 0 | 0 |
| 2018 | 0 | 0 |
| 2017 | 0 | 0 |
| 2016 | 0 | 0 |
| 2015 | 0 | 0 |
| 2014 | 0 | 0 |
| 2013 | 0 | 0 |
| 2012 | 0 | 0 |
| 2011 | 20 | 20 |
| 2010 | 20 | 20 |
| 2009 | 20 | 20 |
| 2008 | 20 | 20 |
| 2007 | 3 | 3 |
| 2006 | 2 | 2 |
| 2005 | 3 | 3 |
| 2004 | 0 | 0 |
| 2003 | 0 | 0 |
| 2002 | 0 | 0 |
| 2001 | 0 | 0 |
Sources EIA-860 · EIA-860M · EIA
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
Assets 1
Assets
1
Capacity
6.0 MW
- Oil: 6.0 MW, 1 asset
Operates 1 power plant
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Held by |
|---|---|---|---|---|---|
| Shepherd Center | Oil | Operates | 6 MW | US-GA | Shepherd Center |
Sources 2
Registers
2
Reuse terms
- 2 Open license
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 15
within 25 kmProjects
15
within 25 km
Nearest
4.0 km
DATA CENTER ATLANTA, LLC
All 15NearbyShowing all 15 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Built | DATA CENTER ATLANTA, LLC | Large load | — | 4.0 km away | nearest: Shepherd Center |
| Built | QUALITY INVESTMENT PROPERTIES METRO, LLC | Large load | — | 4.7 km away | nearest: Shepherd Center |
| Filed | Leibherr LR 1400 (Atlanta data centre) | Large load | — | 5.8 km away | nearest: Shepherd Center |
| Built | GOOGLE, INC. | Large load | — | 19.0 km away | nearest: Shepherd Center |
| Filed | TA Reality Ellenwood Data Center | Large load | — | 20.3 km away | nearest: Shepherd Center |
| Built | ATL11 DATA CENTER | Large load | — | 20.4 km away | nearest: Shepherd Center |
| Filed | FT GIllem MASE Crane (Forest Park data centre) | Large load | — | 20.6 km away | nearest: Shepherd Center |
| Under construction | ROCK HOUSE ROAD DATA CENTER | Large load | — | 20.6 km away | nearest: Shepherd Center |
| Under construction | Vantage Data Center Crane | Large load | — | 20.9 km away | nearest: Shepherd Center |
| Postponed | DeKalb County Green Energy Facility | Biomass | 1.6 MW | 21.3 km away | nearest: Shepherd Center |
| Under construction | ATL06 DATA CENTER | Large load | — | 21.9 km away | nearest: Shepherd Center |
| Built | ALIGNED DATA CENTERS ATL01 | Large load | — | 22.8 km away | nearest: Shepherd Center |
| Under construction | FTY01 DATA CENTER | Large load | — | 23.0 km away | nearest: Shepherd Center |
| Built | TRAVELERS DATA CENTER | Large load | — | 23.7 km away | nearest: Shepherd Center |
| Under construction | Solar BESS Hybrid | Gas, combustion turbine | 6 MW | 24.0 km away | nearest: Shepherd Center |
Sources EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES · Georgia EPD · EIA-860M
Sources
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- Georgia EPD Air Web issued air permits (data-centre and hosting facilities, first permitted in the last 24 months)Source: Georgia Environmental Protection Division, Air Protection Branch
- EIA-860M Preliminary Monthly Electric Generator Inventory