UTS SJ1 LLC — Power plant · Gas, other · UTS SJ1 LLCSJC02 & SJC03 DATA CENTER — Large load · CA · 1.1 mi awayLBA Data Center West — Filed · Large load · CA · 3.6 mi awayEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 3.6 mi awayEdgecore -3580 — Filed · Large load · CA · 3.6 mi awayKifer BESS 1 — Under construction · Storage · CA · 50 MW · 4.0 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 4.1 mi awaySV8 DATA CENTER — Large load · CA · 4.2 mi away4054 Digital Realty — Built · Large load · CA · 4.2 mi awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 4.4 mi awayPRIME DATA CENTERS — Built · Large load · CA · 4.7 mi away1200 Memorex Skybox Data Center — Filed · Large load · CA · 4.8 mi awaySKYBOX DATA CENTER — Built · Large load · CA · 4.9 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 5.1 mi away888 Ross Data Center — Filed · Large load · CA · 5.5 mi awayDC-N (San Jose data centre) — Filed · Large load · CA · 6.9 mi awayData Center — Filed · Large load · CA · 7.7 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 8.1 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 9.9 mi away
  • Combustion
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

Key facts

Power plant ownerNo parent recordedLike 48,147 of 50,300 companies here. Why
States
CA
Registered in
United States

On the map, by stage

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2012 to 2019
  • Gas
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasTotal (MWh)
201900
201800
201700
2016918918
20157,0057,005
20149,7179,717
201310,77010,770
2012 (part year)6,7886,788

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

1.5 MW

MW by technology
  1. Gas, other: 1.5 MW, 1 asset

Operates 1 power plant

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Held by
UTS SJ1 LLC Gas, other Operates 1.5 MW US-CA UTS SJ1 LLC

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 18

within 15 mi

Projects

18

within 15 mi

Nearest

1.1 mi

SJC02 & SJC03 DATA CENTER

All 18NearbyShowing all 18 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Unknown SJC02 & SJC03 Data Center Large load — 1.1 mi away nearest: UTS SJ1 LLC
Filed LBA Data Center West Large load — 3.6 mi away nearest: UTS SJ1 LLC
Unknown Edgecore Data Center MECP1 Santa Clara 1 Project Large load — 3.6 mi away nearest: UTS SJ1 LLC
Filed Edgecore -3580 Large load — 3.6 mi away nearest: UTS SJ1 LLC
Under construction Kifer BESS 1 Storage 50 MW 4.0 mi away nearest: UTS SJ1 LLC
Under construction Fremont CA AutoFactory Solar 3.8 MW 4.1 mi away nearest: UTS SJ1 LLC
Unknown SV8 Data Center Large load — 4.2 mi away nearest: UTS SJ1 LLC
Built 4054 Digital Realty Large load — 4.2 mi away nearest: UTS SJ1 LLC
Unknown Vantage Data Centers Management CO , LLC Large load — 4.4 mi away nearest: UTS SJ1 LLC
Built Prime Data Centers Large load — 4.7 mi away nearest: UTS SJ1 LLC
Filed 1200 Memorex Skybox Data Center Large load — 4.8 mi away nearest: UTS SJ1 LLC
Built Skybox Data Center Large load — 4.9 mi away nearest: UTS SJ1 LLC
Postponed Waste Management Tri-Cities LFGTE Biomass 4.8 MW 5.1 mi away nearest: UTS SJ1 LLC
Filed 888 Ross Data Center Large load — 5.5 mi away nearest: UTS SJ1 LLC
Filed DC-N (San Jose data centre) Large load — 6.9 mi away nearest: UTS SJ1 LLC
Filed Data Center Large load — 7.7 mi away nearest: UTS SJ1 LLC
Under construction 7999 Gateway Solar Solar 4.6 MW 8.1 mi away nearest: UTS SJ1 LLC
Announced Gateway#1&2 (Newark CA) Solar 1.1 MW 9.9 mi away nearest: UTS SJ1 LLC

Sources EPA ICIS-NPDES · FAA OE/AAA · EIA-860M · CAISO · EPA ICIS-Air

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 28, 2026Source: California ISO
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026

Every source and license · Attribution