Show on map
Exact site not public
Map
Alpha Digital Campus Combined-cycle and Co-located Load in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Alpha Digital Campus Combined-cycle and Co-located Load
Gas, combined cycle
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 28INR0499
- In-service date
- (stated)
- Location
- Reeves County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- PowerBridge LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “Gas - Combined-Cycle”
- Connects at
- 38044 TNCOWPEN__3 345kVConnection point58.3 MW active (1 of 1 projects).
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources ERCOT