Show on map
APV Schwarzholz solar farm 3APV Schwarzholz 8.92 MW solar project -- — Announced · Solar · 8.9 MW · 0.2 km awayAPV Schwarzholz solar farm 4 — Announced · Solar · 23.7 MW · 0.8 km awayAPV Schwarzholz solar farm 2 — Announced · Solar · 18.3 MW · 1.1 km awayAPV Schwarzholz solar farm 5 — Announced · Solar · 26.8 MW · 1.2 km awayAPV Schwarzholz solar farm 1 — Announced · Solar · 17.7 MW · 1.2 km awayArneburg power station Unit 1 — Canceled · Coal · 800 MW · 4.9 km awayArneburg power station Unit 2 — Canceled · Coal · 800 MW · 4.9 km awayStendal nuclear power plant 1 — Canceled · Nuclear · 1,000 MW · 4.9 km awayStendal nuclear power plant 2 — Canceled · Nuclear · 1,000 MW · 4.9 km awayStendal nuclear power plant 3 — Canceled · Nuclear · 1,000 MW · 4.9 km awayStendal nuclear power plant 4 — Canceled · Nuclear · 1,000 MW · 4.9 km awayPlatz solar farm -- — Announced · Solar · 2 MW · 7.3 km awayPVA Schönberg solar farm -- — Announced · Solar · 3 MW · 19.7 km awaySolarpark Breddin I PVA solar project -- — Announced · Solar · 20 MW · 20.5 km awayPVSTUED4139 solar farm -- — Announced · Solar · 53.3 MW · 23.0 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

APV Schwarzholz solar farm 3

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Sachsen-Anhalt, Germany

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

At this site

2 records at APV Schwarzholz solar farm 3At this siteGrouped by the same exact location and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing APV Schwarzholz solar farm 3 this record Solar 22.7 Announced
Another phase high confidence APV Schwarzholz 8.92 MW solar project -- Solar 8.9 Announced

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
APV Schwarzholz 8.92 MW solar project -- Announced Solar 0.2 km 8.9
APV Schwarzholz solar farm 4 Announced Solar 0.8 km 23.7
APV Schwarzholz solar farm 2 Announced Solar 1.1 km 18.3
APV Schwarzholz solar farm 5 Announced Solar 1.2 km 26.8
APV Schwarzholz solar farm 1 Announced Solar 1.2 km 17.7
Arneburg power station Unit 1 Canceled Coal 4.9 km 800
Arneburg power station Unit 2 Canceled Coal 4.9 km 800
Stendal nuclear power plant 1 Canceled Nuclear 4.9 km 1,000
Stendal nuclear power plant 2 Canceled Nuclear 4.9 km 1,000
Stendal nuclear power plant 3 Canceled Nuclear 4.9 km 1,000
Stendal nuclear power plant 4 Canceled Nuclear 4.9 km 1,000
Platz solar farm -- Announced Solar 7.3 km 2
PVA Schönberg solar farm -- Announced Solar 19.7 km 3
Solarpark Breddin I PVA solar project -- Announced Solar 20.5 km 20
PVSTUED4139 solar farm -- Announced Solar 23.0 km 53.3

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution