Arlington Battery Energy Storage System
Storage
Key facts
Storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Bonneville Power Administration (BPAT)
- In-service date
- (stated)
- Location
- Snohomish County, Washington
Details
Who’s behind it
- Developer
- PUD No 1 of Snohomish County - (WA)
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Batteries”
- EIA plant
- 67669 generator ABESS
Timeline
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-10-01.
- EIA-860M Preliminary Monthly Electric Generator Inventory: Status raw (U) Under construction, less than or equal to 50 percent complete → (V) Under construction, more than 50 percent complete.
- Stated In-service date stated by EIA-860M.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.