Show on map
Artificial Intelligence Data CenterAPL DATA CENTER — Built · Large load · WA · 0.4 mi away30 Ton Crane (East Wenatchee data centre) — Built · Large load · WA · 1.1 mi awayOrion - Helion — Filed · Other · WA · 50 MW · 7.3 mi away
  • Unspecified fuel
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Artificial Intelligence Data Center

Data center

Kind
Data center
Location
Douglas County, Washington

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Data center source: “Data Center”
Capacity (MW)
Not stated

Timeline

  • Observed as filed in FAA OE/AAA (source status: “Determined - No Hazard”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources FAA OE/AAA

Sources

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
APL DATA CENTER Built Large load 0.4 mi
30 Ton Crane (East Wenatchee data centre) Built Large load 1.1 mi
Orion - Helion Filed Other 7.3 mi 50

Sources EPA ICIS-NPDES · FAA OE/AAA · EIA-860M

Sources

Attribution