Show on map
- Unspecified fuel
- Loads
- In development
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Unspecified fuel
- Loads
- In development
- Operating
- Size not stated
Artificial Intelligence Data Center: the source's site coordinate and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Artificial Intelligence Data Center
Data center
- Kind
- Data center
- Location
- Douglas County, Washington
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Data center source: “Data Center”
- Capacity (MW)
- Not stated
Timeline
- Observed as filed in FAA OE/AAA (source status: “Determined - No Hazard”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources FAA OE/AAA
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| APL DATA CENTER Built | Large load | 0.4 mi | |
| 30 Ton Crane (East Wenatchee data centre) Built | Large load | 1.1 mi | |
| Orion - Helion Filed | Other | 7.3 mi | 50 |
Sources EPA ICIS-NPDES · FAA OE/AAA · EIA-860M