Show on map
Map
Arvah B Hopkins: the source's site coordinate. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Arvah B Hopkins
Gas, combined cycle
Key facts
Gas, combined cycle Postponed (source status: Canceled or Postponed) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- City of Tallahassee (TAL)
- Location
- Leon County, Florida
Details
Who’s behind it
- Developer
- City of Tallahassee - (FL)
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Capacity (MW)
- 322.5 Capacity is the sum of the 3 generators listed under Sources.
- EIA plant
- 688 3 generatorsEIA generatorsPlant 688 5, CT A, GT5
Timeline
- Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M