Show on map
Assuruá 6 wind farm 13Assuruá 6 wind farm 12 — Announced · Wind · 34.8 MW · 2.2 km awayAssuruá 6 wind farm 14 — Announced · Wind · 40.6 MW · 3.3 km awayAssuruá 6 wind farm 5 — Announced · Wind · 34.8 MW · 8.9 km awayAssuruá 6 wind farm 6 — Announced · Wind · 40.6 MW · 9.0 km awayAssuruá 6 wind farm 4 — Announced · Wind · 34.8 MW · 9.3 km awayAssuruá 6 wind farm 3 — Announced · Wind · 34.8 MW · 9.3 km awayAssuruá 6 wind farm 7 — Announced · Wind · 34.8 MW · 9.7 km awayAssuruá 6 wind farm 2 — Announced · Wind · 40.6 MW · 10.9 km awayAssuruá 6 wind farm 1 — Announced · Wind · 40.6 MW · 11.2 km awayAssuruá 6 wind farm 8 — Announced · Wind · 40.6 MW · 13.1 km awaySerra do Gentio do Ouro wind farm 22 — Announced · Wind · 43.4 MW · 19.8 km awaySerra do Gentio do Ouro wind farm 21 — Announced · Wind · 37.2 MW · 21.2 km awaySerra do Gentio do Ouro wind farm 23 — Announced · Wind · 24.8 MW · 22.5 km awaySerra do Gentio do Ouro wind farm 16 — Announced · Wind · 18.6 MW · 24.9 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Assuruá 6 wind farm 13

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Bahia, Brazil

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “wind / Onshore”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Assuruá 6 wind farm 12 Announced Wind 2.2 km 34.8
Assuruá 6 wind farm 14 Announced Wind 3.3 km 40.6
Assuruá 6 wind farm 5 Announced Wind 8.9 km 34.8
Assuruá 6 wind farm 6 Announced Wind 9.0 km 40.6
Assuruá 6 wind farm 4 Announced Wind 9.3 km 34.8
Assuruá 6 wind farm 3 Announced Wind 9.3 km 34.8
Assuruá 6 wind farm 7 Announced Wind 9.7 km 34.8
Assuruá 6 wind farm 2 Announced Wind 10.9 km 40.6
Assuruá 6 wind farm 1 Announced Wind 11.2 km 40.6
Assuruá 6 wind farm 8 Announced Wind 13.1 km 40.6
Serra do Gentio do Ouro wind farm 22 Announced Wind 19.8 km 43.4
Serra do Gentio do Ouro wind farm 21 Announced Wind 21.2 km 37.2
Serra do Gentio do Ouro wind farm 23 Announced Wind 22.5 km 24.8
Serra do Gentio do Ouro wind farm 16 Announced Wind 24.9 km 18.6

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution