Show on map

Exact site not public

Bar Candela Solar SLF

Solar

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Freestone County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar - Photovoltaic Solar”
Connects at
Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279)Connection point200.3 MW active (2 of 2 projects).

At this site

2 records at Bar Candela Solar SLFAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Bar Candela Solar SLF this record Solar 200.3 Contracted
Co-located, other technology high confidence Bar Candela Storage SLF Storage — Contracted

Sources ERCOT

Sources

  • ERCOTTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as contracted in ERCOT (source status: “Completed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources ERCOT

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem