Beacon AI Centers Indus Project CC4
Gas, combined cycle
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Alberta, Canada
Details
Who’s behind it
- Developer
- Indus Power Generation LP
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “oil/gas / combined cycle”
At this site
5 records at Beacon AI Centers Indus Project 1At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Beacon AI Centers Indus Project 1 | Gas, reciprocating engine | 460 | Announced |
| Another phase medium confidence | Beacon AI Centers Indus Project CC2 | Gas, combined cycle | 261 | Announced |
| Another phase medium confidence | Beacon AI Centers Indus Project CC1 | Gas, combined cycle | 261 | Announced |
| Another phase medium confidence | Beacon AI Centers Indus Project CC4 this record | Gas, combined cycle | 261 | Announced |
| Another phase medium confidence | Beacon AI Centers Indus Project CC3 | Gas, combined cycle | 261 | Announced |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Beacon AI Centers Indus Project 1 Announced | Gas, reciprocating engine | 0.0 km | 460 |
| Beacon AI Centers Indus Project CC1 Announced | Gas, combined cycle | 0.0 km | 261 |
| Beacon AI Centers Indus Project CC2 Announced | Gas, combined cycle | 0.0 km | 261 |
| Beacon AI Centers Indus Project CC3 Announced | Gas, combined cycle | 0.0 km | 261 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.